contact us

Public Works

 

 Highway Roadmaster  Rick Brewbaker
717-732-1815 x1253
publicworks@eastpennsboro.net
 Facilities Director Mike Dobson
717-732-1815 x1254
publicworks@eastpennsboro.net
 Wastewater Treatment Plant Superintendent Andy Kirkessner
717-732-3621 x1247
wastewater@eastpennsboro.net
 Assistant Wastewater Treatment Plant Superintendent Ed Myers
717-732-3621 x1248
wastewater@eastpennsboro.net


East Pennsboro Township has a first rate Department of Public Works, which includes divisions for HighwayWastewater Treatment and CollectionsStormwater and Parks. Our Roadmaster, Wastewater Treatment Plant Superintendent, Assistant Wastewater Treatment Plant Superintendent and Facilities Manager, with input from the Public Works Director, are responsible for all the various activities of the 30-member department. The main Public Works building and yard is located at 645 Tower Road, Enola.

The Highway Division maintains more than 84 miles of Township roads and streets annually, as well as picking up leaves in the fall and clearing snow in the winter. Township staff repair and replace stormwater collection and conveyance infrastructure throughout the Township.

The Wastewater Treatment and Collections Divisions operate and maintain an increasingly sophisticated 4.4 million gallon per day wastewater treatment plant, 11 pumping stations and many miles of underground sewer pipelines throughout the Township. The wastewater treatment plant is located at 21 Dulles Drive East, Camp Hill.


For Sewer and Sanitation Billing, click here.


For Recycling and Refuse Information, click here.


Standard Specifications for Public Improvements

All public improvements must comply with the Township's Standard Construction and Material Specifications. The current specifications (click here for a copy) were last revised in 1995 and are available at the Township Administration building for purchase. The Township is currently reviewing a draft of revisions to the specifications, which will become effective once finalized.